Scope of Work

  • Division 1 – General
  • Estimated General Requirements
  • Project Indirects
  • Sr. Project Manager
  • Project Coordinator
  • Jr. Project Coordinator
  • Site Superintendent
  • Assistant Site Superintendent
  • Sr. Site Supervisor
  • Carpenter
  • Labour
  • Site Coordinator
  • Jr. Site Coordinator
  • Health and Safety Manager
  • Design Coordinator
  • Sr. Estimator
  • Estimator
  • Estimating Coordinator
  • Jr. Estimator
  • Owners Representative
  • Director of Estimating
  • Construction Management Fee
  • Staff Expenses:
  • Vehicle
  • Furniture
  • Mileage (PM Only)
  • Carpenters Overtime
  • Labourers Overtime
  • Flights
  • Vehicle Rental and Gas (PM)
  • Vehicle Gas per Month
  • Professional Services:
  • Architect
  • Structural
  • Mechanical
  • Electrical
  • Civil
  • Landscape
  • Interior Designer
  • Sprinkler
  • Testing & Inspections
  • Acoustics
  • Wind Study Consultant
  • Window/Glazing Consultant
  • Lignting Consultant
  • Elevator Consultant
  • Buletin 19
  • Geotechnical
  • Shoring Consultant
  • Ground Water Mgt
  • Energy Efficiency Consultant
  • Layout
  • Reproduction Services
  • Safety Inspection Services 3rd Party
  • Cost Consultant
  • Broker Commissions
  • Class Estimate
  • Live Out Arrangement (LOA):
  • OTA – Superintendent
  • OTI – Superintendent
  • Room – PC & PM
  • Board – PC & PM
  • Room – Assistant Superintendent
  • Board – Assistant Superintendent
  • Room – Carpenter
  • Board – Carpenter
  • Room – Labourer
  • Board – Labourer
  • Legal Survey:
  • Waste Management:
  • Waste Management Audit
  • Waste Management Coordinator
  • LEED Consultant
  • Site Office:
  • Office Rental from Katalyst
  • Office Trailer – Rental – 24′
  • Office Trailer – Rental – 32′
  • Office Trailer – Rental – 40′
  • Office Trailer – Rental – 60′
  • Office Trailer – Delivery/Return
  • Office Furniture Rental
  • Site Storage (8×40 C-Can)
  • Site Storage Delivery/Return
  • Setup/Removal/Stairs
  • Trailer Security
  • Office Supplies
  • Fax Rental
  • Computer Service
  • Courier Services
  • Office Cleaning
  • Signs:
  • Project Sign
  • Owners Sign
  • Photographs & Printing:
  • Video Survey
  • Progress Photos
  • Photograph Supplies
  • General & Schedule Printing Costs
  • As-Built Manuals
  • As-Built Drawings
  • Adjacent Building Survey
  • AutoCAD As-Builts
  • Communications:
  • Telephone Line #3&4
  • Fax Line
  • Computer Line
  • Purchase Phone Equipment
  • Cellular (Operation & Rental)
  • Long Distance Charges
  • Walkie Talkies
  • Sub Trade Line
  • Sub Trade Kiosk
  • Hook Up
  • Telephone Line #1 &2
  • Washrooms:
  • Cleaning & Supplies
  • Portable Toilets (Chemical) w/ Sani (1ea)
  • Pickup/Delivery – Single
  • Portable Washroom – 1 Unit – Each
  • Pickup/Delivery – Double
  • Portable Washroom – 2Unit – Each
  • Pickup/Delivery – 6 unit
  • Portable Washroom – 6 Unit – Each
  • Pickup/Delivery – 12 unit
  • Portable Washroom – 12 Unit – Each
  • Temporary Power & Lighting:
  • Generator Temp Power within 5 mths
  • Fuel for Generator
  • Main Panel
  • Feeders to Distribution Boards
  • Distribution Boards
  • Relocate Distribution Boards
  • Site Office
  • Maintain Temp Lights
  • Temp Lights
  • Power & Lighting Consumption (Hydro)
  • Temporary Power
  • Temporary Power Pole Hookup
  • Other/Future
  • Other/Future
  • Other/Future
  • Other/Future
  • Craning & Hoisting:
  • Crane Base – Install & Remove
  • Design Fees for Crane Location
  • Tower Crane Erect & Dismantle
  • Tower Crane Rental
  • Hydro Consumption (Crane)
  • Material Hoist Erect & Dismantle
  • Material Hoist Base – 1 Locations
  • Material Hoist Rental
  • Hydro Supply Crane & Hoist
  • Hydro Consumption (Hoist)
  • Operator Tower Crane
  • Operator Tower Crane – Overtime
  • Material Hoist Operator
  • Misc. Crane
  • Landings for Material Off Loading
  • Temporary Water:
  • Hook Up
  • Consumption
  • First Aid & Safety:
  • First Aid Supplies
  • Fire Extinguishers
  • Signage
  • Barricades
  • Safety Rails
  • Flagman
  • Safety Inspections
  • Safety Misc Labour
  • Hoarding & Security:
  • Temporary Fencing
  • Safety Fencing
  • Site Hoarding – Gates
  • Interior Hoarding – Plywood 8′ & Poly
  • Hoarding Permit
  • Sidewalk &/or Street Rental
  • Watchman (Nights/Holidays)
  • Covered Walkways
  • Road Barrier Curbs
  • Temporary Protection:
  • Protect Finishes
  • Cover Existing Windows
  • Temp Window/Door Enclosures
  • Remove & Dispose
  • Elevator Protection
  • Tarps
  • Temp. Building Enclosure
  • Temp. Scaffolding
  • Small Tools & Rentals:
  • Small Tools
  • Expendable Supplies
  • Small Rentals
  • Bobcat
  • Temporary Dewatering
  • Lift Equipment
  • Progressive Cleanup:
  • Garbage Chute
  • Janitor Services
  • General Labourer
  • General Labourer (Last # Months)
  • Garbage Bins
  • Dump Fees
  • 017419
  • Final Cleanup:
  • Final Cleanup
  • Winter Conditions:
  • Dry-Air Heating System (Arctic Bear)
  • Natural Gas (Dry-Air System)
  • Foundation Tarps
  • Ground Thaw System
  • Exterior Hoarding / Scaffolding
  • Heater Rental & Gas for Hoarding
  • Fans
  • Propane – Site Trailer
  • (15P x 6H x 2 b/d x 3D)
  • Propane – Walls / Columns
  • (20P x 10H x 2 b/d x 2D)
  • Masonry Enclosure
  • Snow Removal
  • Straw Bales
  • Firewatch
  • Cost of Natural Gas for Building
  • Temporary Heat:
  • Temporary Fuel & Oil
  • Temporary Heat Cool & Vent
  • Temorary Natural Gas
  • Site:
  • Temporary Roads
  • Temporary Barriers and Entry
  • Mud Tracking
  • Snow Plowing
  • Warranty / Bonding / Legal:
  • Bonding
  • Insurances
  • Interest and Carrying Charges
  • Building Permit
  • HVAC Permit
  • New Sprinkler System
  • New Fire Alarm System
  • Electromagnetic Locks / DHOD
  • Plumbing Permit (per Fixture)
  • Hot Water Heaters
  • Testable Backflow Prevention Devices
  • Chbasins/Manholes/Roof Drains
  • Development Charges
  • Warranty Management
  • Subtrade Bonding Allowance
  • Deficiency Clean Up
  • Testing:
  • Soils Testing
  • Concrete Testing
  • Compaction Testing
  • Masonry Testing
  • Acoustic Testing
  • Window Leakage Testing
  • Railing Testing
  • Miscellaneous:
  • Cash Allowances
  • Cutting and Phing
  • Coredrilling
  • Subtrade Incentives
  • Mockups
  • Quality Control
  • Division 2 – Existing Conditions
  • Geotextiles
  • Site Servicing
  • Final Grading
  • Rough Grading
  • Backfill Material
  • Excavation Building Footings/Pads
  • Trenching
  • Demolition
  • Utility Line Removal
  • Site Remediation
  • Contaminated Site Removal
  • Water Remediation
  • Aggregate Base Courses
  • Facility Remediation
  • Asbestos Abatement
  • Lead Abatement
  • Mold Remediation
  • Division 3 – Concrete
  • Concrete Forming
  • Concrete Accessories
  • Concrete Reinforcing
  • Welded Wire Fabric Reinforcing
  • Cast In Place Concrete
  • Concrete Place & Finishing
  • Concrete Pumping
  • Concrete Additives
  • Rebar Accessories
  • Rebar Placing
  • Concrete Cutting and Boring
  • Division 4 – Masonry
  • Masonry Anchorage & Reinforcing
  • Unit Masonry Bldg A & B
  • Stone veneer
  • Block Assemblies
  • Division 5 – Metals
  • Metal Fasteners
  • Structural Metal Framing
  • Structural Steel Framing
  • Metal Joist
  • Steel Beam Install & Accessories
  • Steel Decking
  • Wind Studs
  • Structural Metal Stud Framing Envelope
  • Metal Fabrications
  • Metal Stairs (Handrails)
  • Metal Balcony Railings
  • Division 6 – Wood, Plastics and Composites
  • Wood and Plastic Fasteners
  • Rough Carpentry
  • Wood Framing
  • Heavy Timber
  • Wood Decking
  • Sheathing
  • Glue Laminated Structural Units
  • Wood Trusses
  • Premanufactured Wood Beams & Joists
  • Finish Carpentry S&I
  • Finish Carpentry-Common
  • Finish Carpentry-Install
  • Finish Carpentry-Finishing
  • Exterior Finish Carpentry
  • Laminated Plastics
  • Architectural Woodwork
  • Architectural Cabinetry
  • Wood Panelling
  • Wood Stairs and Railings
  • Interior Trim
  • Division 7 – Thermal and Moisture Protection
  • Snow Guards
  • Roof Pavers
  • Fire and Smoke Protection
  • Firestopping
  • Joint Protection
  • Joint Sealants
  • Damproofing
  • Built-up Bituminous Waterproofing
  • Membrane Waterproofing
  • Traffic Topping- Thin Set Sealant
  • Thermal Insulation Building Footprint
  • Fluid-Applied Waterproofing
  • Sprayed Insulation
  • Roof and Deck Insulation
  • Exterior Insulated and Finish System (EIFS)
  • Sheet Vapour Retarders
  • Air Barriers
  • Shingle Roofing
  • Natural Roof Coverings
  • Roof Panels
  • Wall Panels
  • Insulated Metal Wall Panels
  • Siding
  • Steel Siding
  • Fabricated Wall Panels
  • Membrane Roofing
  • Built-up Bituminous Roofing
  • Elastomeric Membrane Roofing (EPDM)
  • Thermoplastic Membrane Roofing
  • Roll Roofing
  • Flashing & Sheet Metal
  • Sheet Metal Roofing
  • Sheet Metal Flashing and Trim
  • Roof Hatches
  • Division 8 – Openings
  • Metal Doors and Frames
  • Fire Rated Doors & Frames
  • HM Suite Entry Doors
  • Composite Doors
  • Specialty Doors and Frames
  • Access Doors and Panels
  • Coiling Doors and Grilles
  • Detention Doors & Frames
  • Sectional Doors
  • Sectional Door S.E. Elevation
  • Curtainwall Entrance
  • Windowall
  • Automatic Sliding Entrance Doors
  • Windows
  • Metal Windows
  • Wood Windows
  • Vinyl Windows
  • Roof Windows and Skylights
  • Finish Hardware
  • Fire Shutters
  • Window Hardware
  • Access Control Hardware
  • Interior Glazing
  • Window Film/Tint
  • Mirrors
  • Louvers and Vents
  • Division 9 – Finishes
  • Plaster and Gypsum Board
  • Plaster and Gypsum -Common
  • Plaster and Gypsum -Steel
  • Plaster and Gypsum -Hangers
  • Plaster and Gypsum -Tape
  • Pllaster Fabrications
  • Tiling
  • Tiling-Common
  • Tiling-Floor/Wall Tile
  • Tiling-Backsplash
  • Ceilings
  • Specialty Ceilings
  • Wood Flooring
  • Resilient Flooring
  • Resilient Base and Accessories
  • Resilient Athletic Flooring
  • Fluid-Applied Flooring (i.e. epoxy)
  • Carpeting
  • Wall Coverings
  • Special Wall Surfacing
  • Acoustic Treatment
  • Painting and Coating
  • Painting – Parking Level
  • Painting-Prime Interior
  • Painting-Interior
  • Painting Interior 2nd Coat
  • Staining and Transparent Finishing
  • High-Performance Coatings
  • Special Coatings Balcony Slabs
  • Division 10 – Specialties
  • Chalkboards and Tackboards
  • Signage
  • Interior Wayfinding
  • Partitions
  • Operable Partitions
  • Wall & Door Protection
  • Toilet, Bath and Laundry Accessories
  • Tub & Shower Enclosures
  • Manufactured Fireplaces
  • Safety Specialties
  • Storage Specialties/Lockers
  • Wardrobe & Closet Specialties
  • Hat and Coat Racks
  • Postal Specialties
  • Exterior Specialties
  • Flagpoles
  • Other Specialties
  • Division 11 – Equipment/Safety/Security
  • Window Washing Systems
  • Parking Control Equipment
  • Loading Dock Equipment
  • Rubbish Chutes
  • Detention Equipment
  • Commercial Equipment
  • Residential Appliances
  • Appliances-Common
  • Appliances-Delivery
  • Appliances-2nd Delivery
  • Audio-Visual Equipment
  • Athletic Equipment
  • Vacuum Cleaning systems
  • Solid Waste Handling Equipment
  • Foodservice Equipment
  • Healthcare Equipment
  • Division 12 – Furnishings
  • Art
  • Window Treatments
  • Kitchen Cabinetry
  • Washroom Cabinetry
  • Stone Countertops
  • Cultured marble Countertops
  • Furnishings and Accessories
  • Entrance Floor Mats & Frames
  • Furniture
  • Seating
  • Detention Furniture
  • Institutional Furniture
  • Bicycle Racks
  • Division 13 – Specialty Construction
  • Swimming Pools
  • Hot Tubs
  • Saunas
  • Steam baths
  • Fabricated Amenity Structures
  • Sound/Vibration/Seismic
  • Special Construction
  • Athletic & Recreational Special Construction
  • Division 14 – Conveying Equipment
  • Elevators – Traction -5 stops MRL
  • Escalators & Moving Walks
  • Hydraulic Elevators
  • Lifts
  • Division 21 – Fire Suppression
  • Fire-Suppression Sprinkler-Common
  • Fire-Suppression Sprinkler -Parking (Dry System)
  • Fire-Suppression Sprinkler-R
  • Fire-Suppression Sprinkler-T
  • Fire Suppression
  • Division 22 – Plumbing
  • Plumbing-Common
  • Plumbing- Stack Rough-In
  • Plumbing -Riser/Main
  • Plumbing – Suite Water
  • Plumbing -Trim
  • Plumbing – Heat Pump Install
  • Plumbing – HPSupply/Return
  • Plumbing-HP Cassis i
  • Plumbing Piping
  • Plumbing Equipment
  • Plumbing Fixtures
  • Division 23 – HVAC
  • HVAC-Common
  • HVAC- Rough-In
  • HVAC – Trim
  • HVAC Air Distribution
  • Central Heating Equipment
  • Central Cooling Equipment
  • HVAC Testing & Balancing
  • HVAC Insulation
  • Solar Energy Heating Equipment
  • Division 25 – Building Automation
  • Integrated Automation (Building Automation System)
  • Integrated Automation Facility Controls
  • Division 26 – Electrical
  • Electrical
  • Division 27 – Communications
  • Data Communications
  • Voice Communications
  • Division 28 – Electronic Safety and Security
  • Electronic Safety and Security
  • Electronic Access Control and Intrusion Detection
  • Division 31 – Earthwork
  • Site Clearing
  • Earth Moving
  • Dewatering
  • Ground Water Discharge
  • Backfill Granular A Place
  • Backfill Granular A Supply
  • LTP Backfill Granular B Supply
  • LTP Backfill Granular B Place
  • Anchor Tiebacks
  • Driven Piles
  • Bored Piles and Shoring
  • Ground Improvement Excavation of Existing
  • Special Foundations Geo Piers
  • Division 32 – Exterior Improvements
  • Softscape & Hardscaping (Bases, Ballasts and Paving)
  • Fences and Gates
  • Retaining Walls
  • Site Furnishings
  • Irrigation
  • Planting
  • Trees
  • Flexible Paving (Asphalt)
  • Rigid Paving (Concrete)
  • Unit Paving (Interlock brick/stone)
  • Painted Pavement Markings
  • Athletic and Recreational Surfacing
  • Subdrainage
  • Project Management